| YEAR |
COMPLETED
PROJECTS |
| 1997 |
Expanded
Wilmington Wastewater Treatment Plant (Cost: $30 Million) Increased the
capture and treatment of CSOs from 49% to 70%, one of the highest capture
rates in the nation |
| 1999 |
Created
Wilmingtons Long Term Control Program: Implemented EPA recommended
9 Minimum Controls; created a CSO Crew to inspect, clean and maintain
CSO structures and keep them free of obstructions |
| 1999 |
Raised
the overflow weir and installed trash netting at CSO 30 |
| 2001 |
Prevented
public access to receiving waters by erecting fences at CSO 31 |
| 2003 |
Revised
Long Term Control Plan to include innovative technology and aggressive
schedule |
| 2004 |
Prevented
overflows at CSO 4b caused by the backwashing of filters at the Water
Treatment Plant |
| 2004 |
Raised
the dam at CSO 4a to contain flows into the Prices Run Interceptor |
| 2005 |
Completed
construction of 2.7 million gallon underground storage tanks in Canby
Park. Connected CSOs 28 and 29 to the tanks and closed those outfalls |